Artwork

Indhold leveret af The G.B. Group Construction & Painting and The G.B. Group Construction. Alt podcastindhold inklusive episoder, grafik og podcastbeskrivelser uploades og leveres direkte af The G.B. Group Construction & Painting and The G.B. Group Construction eller deres podcastplatformspartner. Hvis du mener, at nogen bruger dit ophavsretligt beskyttede værk uden din tilladelse, kan du følge processen beskrevet her https://da.player.fm/legal.
Player FM - Podcast-app
Gå offline med appen Player FM !

EPISODE#182: EV Charging Stations

31:11
 
Del
 

Manage episode 435317495 series 3438704
Indhold leveret af The G.B. Group Construction & Painting and The G.B. Group Construction. Alt podcastindhold inklusive episoder, grafik og podcastbeskrivelser uploades og leveres direkte af The G.B. Group Construction & Painting and The G.B. Group Construction eller deres podcastplatformspartner. Hvis du mener, at nogen bruger dit ophavsretligt beskyttede værk uden din tilladelse, kan du følge processen beskrevet her https://da.player.fm/legal.

Regan Brown, Host, and Bill Mann, President of The GB Group Construction & Painting, sit down with Jeff Reger, President of ACT2EV. In this episode, they discuss the history of ACT2EV, the ins and outs of installing EV charging stations, the associated costs and maintenance, available grants and incentives for HOAs, the importance of unified charging standards, the potential for solar integration, and the future of EV technology.

Chapters

00:00 Introduction and Guest Introductions

05:25 The Potential of EVs to Change Transportation and Energy

08:15 The Process and Cost of Installing EV Charging Stations

12:44 Grants and Incentives for HOAs to Install EV Stations

15:02 Maintenance and Challenges of EV Charging Stations

17:30 Unified Charging Standards and Compatibility

21:32 The Future of EV Technology and Infrastructure

23:34 Life Expectancy and Planning for EV Charging Stations

29:06 Educating HOAs and Realistic Cost Expectations

32:22 Appreciation for HOAs and Conclusion

  continue reading

189 episoder

Artwork
iconDel
 
Manage episode 435317495 series 3438704
Indhold leveret af The G.B. Group Construction & Painting and The G.B. Group Construction. Alt podcastindhold inklusive episoder, grafik og podcastbeskrivelser uploades og leveres direkte af The G.B. Group Construction & Painting and The G.B. Group Construction eller deres podcastplatformspartner. Hvis du mener, at nogen bruger dit ophavsretligt beskyttede værk uden din tilladelse, kan du følge processen beskrevet her https://da.player.fm/legal.

Regan Brown, Host, and Bill Mann, President of The GB Group Construction & Painting, sit down with Jeff Reger, President of ACT2EV. In this episode, they discuss the history of ACT2EV, the ins and outs of installing EV charging stations, the associated costs and maintenance, available grants and incentives for HOAs, the importance of unified charging standards, the potential for solar integration, and the future of EV technology.

Chapters

00:00 Introduction and Guest Introductions

05:25 The Potential of EVs to Change Transportation and Energy

08:15 The Process and Cost of Installing EV Charging Stations

12:44 Grants and Incentives for HOAs to Install EV Stations

15:02 Maintenance and Challenges of EV Charging Stations

17:30 Unified Charging Standards and Compatibility

21:32 The Future of EV Technology and Infrastructure

23:34 Life Expectancy and Planning for EV Charging Stations

29:06 Educating HOAs and Realistic Cost Expectations

32:22 Appreciation for HOAs and Conclusion

  continue reading

189 episoder

所有剧集

×
 
Loading …

Velkommen til Player FM!

Player FM is scanning the web for high-quality podcasts for you to enjoy right now. It's the best podcast app and works on Android, iPhone, and the web. Signup to sync subscriptions across devices.

 

Hurtig referencevejledning